User Tools

Site Tools


commerzbank_glaeubiger

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
commerzbank_glaeubiger [2022/07/02 12:40]
192.99.3.137 old revision restored (2022/06/16 03:36)
commerzbank_glaeubiger [2024/04/26 08:42] (current)
37.57.218.243 old revision restored (2024/04/24 06:52)
Line 1: Line 1:
-sepa-kunde, betrag, datum, gläubiger id  +Lastschrift widersprechen = Telekom\\ 
----- +Lastschrift sperren = Commerzbank\\ 
-nunovo\\ + 
-aok\\+sepa-kunde, betrag, datum, gläubiger id \\ 
 +____________________________________________________\\ 
 +nunovo 149,15\\ 
 +aok  197,50 + 100 \\
 Rundfunk Ard,Zdf, Dracio 52,50 ca. 15. Juli\\ Rundfunk Ard,Zdf, Dracio 52,50 ca. 15. Juli\\
 ------------------------------------------------------------------------- -------------------------------------------------------------------------
- 
- 
 Energiedienst AG Strom / Wasser / Gas / Heizkosten        - 49,00 EUR \\ Energiedienst AG Strom / Wasser / Gas / Heizkosten        - 49,00 EUR \\
 Strom Vertrag 350440358 /Abschlagsforderung /Gläubiger-ID: DE2620000000076713 Wertstellung 04.05.2021 Strom Vertrag 350440358 /Abschlagsforderung /Gläubiger-ID: DE2620000000076713 Wertstellung 04.05.2021
commerzbank_glaeubiger.1656758437.txt.gz · Last modified: 2022/07/02 12:40 by 192.99.3.137