User Tools

Site Tools


commerzbank_glaeubiger

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
commerzbank_glaeubiger [2022/07/02 12:39]
192.99.3.137 old revision restored (2022/03/17 05:15)
commerzbank_glaeubiger [2024/04/26 20:53] (current)
18.189.180.244 old revision restored (2021/10/20 02:05)
Line 1: Line 1:
-Lastschrift widersprechen = Telekom\\ +sepa-kunde, betrag, datum, gläubiger id  
-Lastschrift sperren = Commerzbank\\ +---- 
- +nunovo\\ 
-__**sepa-kunde, betrag, datum, gläubiger id \\**__ +aok\\
-nunovo 149,15\\ +
-aok  197,50 + 100 \\+
 Rundfunk Ard,Zdf, Dracio 52,50 ca. 15. Juli\\ Rundfunk Ard,Zdf, Dracio 52,50 ca. 15. Juli\\
 ------------------------------------------------------------------------- -------------------------------------------------------------------------
 +
 +
 Energiedienst AG Strom / Wasser / Gas / Heizkosten        - 49,00 EUR \\ Energiedienst AG Strom / Wasser / Gas / Heizkosten        - 49,00 EUR \\
 Strom Vertrag 350440358 /Abschlagsforderung /Gläubiger-ID: DE2620000000076713 Wertstellung 04.05.2021 Strom Vertrag 350440358 /Abschlagsforderung /Gläubiger-ID: DE2620000000076713 Wertstellung 04.05.2021
commerzbank_glaeubiger.1656758343.txt.gz · Last modified: 2022/07/02 12:39 by 192.99.3.137